№3 (50), 2019. ТECHNOLOGY OF MACHINE BUILDING

V.P. Voronenko, K.A. Kutselap, V.D. Gurin, A.E. Shaldov

Justification of expediency of carrying outre-planning of the production site at change of the nomenclature of the made products

The way of assessment of expediency of change of planning solution of a production system in case of change of the nomenclature of the made products is offered. The method is based on comparison of the expenses connected with carrying out re-planning, with economic effect of minimization of power of freght traffic. For determination of economic effect it is offered to carry out imitating modeling of work of the production site.

 

 

Keywords: arrangement of the equipment, discrete optimization, imitating modeling, re-planning of the production site.

[ Back to contents ]
[ Get the article ]